महाराष्ट्र गृहनिर्माण व क्षेत्रविकास प्राधिकरण (म्हाडा) ऑनलाइन टेस्ट-No.20 या टेस्ट मध्ये 25 प्रश्न दिले आहे ती सोडवा व नंतर आपले गुण तपासा. महाराष्ट्र गृहनिर्माण व क्षेत्रविकास प्राधिकरण : मित्रांनो मागील वर्षीचा महाराष्ट्र गृहनिर्माण व क्षेत्रविकास प्राधिकरण प्रश्नपत्रिका आणि उत्तरपत्रिका Maharashtra Housing and Area Development Authority Question Paper – Free Online Practice Exam Test सोडवा दररोज एक ! या वर्षीच्या Maharashtra Housing and Area Development Authority (MHADA) ला अगदी असेच प्रश्न येतील !

1➤ The normal time required for the completion of project in the above problem is

2➤ If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be

3➤ A construction schedule is prepared after collecting

4➤ If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively

5➤ Bar charts are suitable for

6➤ The first stage of a construction, is

7➤ A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be

8➤ The probability of completion of any activity within its expected time is

9➤ For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is

10➤ Time and progress chart of a construction, is also known as

11➤ The difference between the time avail-to do a job and the time required to do the job, is known as

12➤ The Overall in-charge of an organization at the site responsible for the execution of the works, is

13➤ For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is

14➤ Various activities of a project, are shown on bar charts by

15➤ The main disadvantage of line organization, is

16➤ The main principle of an organization, is

17➤ A critical ratio scheduling

18➤ A golden rule for the procurement of construction stones, suggests

19➤ If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is

20➤ A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be

21➤ A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistance of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will

22➤ The time with which direct cost does not reduce with the increase in time is known as

23➤ If the gross vehicle weight of a truck is 30 tonne and rolling resistance is 30 kg/tonne, then the tractive effort required to keep the truck moving at a uniform speed is

24➤ For a given size of bucket, the ideal output of a dragline will be least in

25➤ Frederick W. Taylor introduced a system of working known as